Building drawings are produced to show the builder and building inspector how the building is to be constructed. They detail relevant parts of the Building Regulations and British Standards for the method, quantity and quality of the materials to be provided.
Our building drawings will show all of the planning information together with detailed sections through the new building works. On traditional building work we also show the details through the oversite and the foundations, unless this is part is to be provided by a piling contractor or other specialist.
Building works should not be started without the consent of the building inspector.By having approved building control drawings you are less likely to end up with construction problems during the
build. The cost for us to produce building control / building regulations drawings are detailed at the top of this page.We will provide you with the drawings within our standard seven working day
turn around in pdf format to a scale of 1:100 or if you prefer, paper copies can be provided at an additional cost of £35 per copy. On small extensions the planning and building control drawings will
be provided on an A0 size sheet of paper.